1. Before starting the Granite crusher SICOMA concrete mixer, the operator should first check drying equipment internal and external power supply, to ensure network with nobody inside no foreign objects inside the machine.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:concrete batching plant manufacturers,block making machines,concrete batching mixing plant price,etc. We will provide you with the best product and service.

2. In the normal operation of the dryer, only the maintenance personnel to monitor and mechanic is allowed to open the door of the Granite crusher Planetary Concrete Mixers for sale, and others are prevented from being opened. When the drying equipment is running, there must be two people to operate it, one to go inside, another monitor it.

3. Monitoring of people not allowed to leave. When the washing machine to the side, machinists must go without wearing gloves.

4. If abnormal happens, when you want to go Twin Shaft Concrete Mixer, first turn off the emergency stop switch in the dryer door to restart after power washing.

5. Step drying equipment starts and stops must be followed: on the second floor, vibrating screen, sweep the floor with a climbing belt, the negative level with the Dell machine with a long belt. Dried material should be uniform thickness.

Turn your friends on to Scramble Squares: